SupportContact
Gas handling cabinet prepared for a generation-2 upgrade

Home / Services / Gas handling upgrade

Gas handling upgrade

Generation 2

An installed generation-1 handler can be taken out and replaced with generation 2. The visit includes the new cabinet, the control unit, a temperature controller, and a test cooldown.

The upgrade removes the generation-1 control unit and gas handler and fits the generation-2 cabinet in their place. Older frames then use the current software and the maintenance-free circulation pump. Options on the new cabinet are chosen before the visit.

01

What changes

1.0Gas handling upgradeServices

Pumps that do not need a routine strip-down

Generation 2 puts the current pumps and sensors in the handler cabinet. The main circulation pump is a multistage roots pump, so there is no scheduled oil change on that stage.

The generation-2 control software

The same software used on new frames runs on the upgraded handler: cooldown, logs, and the temperature view, without keeping the old control unit.

A modular cabinet

The cabinet is built so extra modules can be added for the room and the experiment. The temperature controller is part of the upgrade, not a later extra.

02

The visit

2.0On-site workTest cooldown included

Remove generation 1

The old control unit and handler come out as part of the service, not as a separate job.

Fit generation 2

The new cabinet, software, and temperature controller are installed and set for that frame.

Test cooldown

The measurement system is cooled once before the visit ends, so the handler is checked on the real cryostat.

Health checks, training, and relocation sit on the services page. The generation-2 handler as it ships on new frames is described with the dilution systems.

Sales

Request an upgrade