System care
A support plan matched to the frame, the wiring, and how often the system is cycled.
CareInstalled systems
3 yrHandler service interval
PartsFor frames in the field
Home / Services
Lifetime of the system
H-gate support stays with the frame after installation. Pick the kind of help you need and send it through the contact form.
A support plan matched to the frame, the wiring, and how often the system is cycled.
Help for an installed system, from a cold-head check through to a mixture question.
Time on a measurement system for a group that does not yet run its own refrigerator.
Move an older handler onto the generation-2 controls and oil-free circulation.
Upgrade or refurbish the cooler so the 4 K stage holds its specified power.
A scheduled review of temperatures, mixture, and leak tightness.
Operating and maintenance sessions for the people who run the system.
Move a refrigerator and its gas handler to another room or building.
Replacement cold traps, valves, and wiring parts held for installed frames.